Tollygunge-Karunamoyee Bridge subsides for 2nd time in a week
Kolkata: The Karunamoyee Bridge that connects Tollygunge with Behala subsided for the second time within a week on Thursday. A crack was noticed in the same portion that had subsided six days ago and was repaired.
Initally, Kolkata Police put guard wall in the affected portion to regulate traffic movement but after a few hours, a strong plate was put on the damaged portion and traffic movement was normalised.
The engineers of Kolkata Metropolitan Development Authority will soon visit the site and take up the maintenance work. It may be mentioned that this part of the bridge had subsided six days ago following which a plate was put on the portion and vehicle services were restored within a few hours after the incident. Later, the bitumen layer was cut open and asphalt was put on the damaged portion. The KMDA decided to undertake up the repair work of the expansion joint later. The pressure of traffic on the bridge has increased reasonably with more vehicles plying on it after Majerhat bridge caved in on September 4. It may be mentioned that this bridge is already on the list of bridges under KMDA that require repair work.