Delhi government clears three new corridors under metro phase V(A)

Update: 2026-02-11 11:17 GMT

New Delhi: Under the leadership of Chief Minister Smt. Rekha Gupta, the Delhi Government has taken a major step towards strengthening and modernizing the capital's public transport system. The Cabinet, chaired by the Chief Minister, approved Metro Phase V(A). She informed that this ambitious project will develop three new corridors totaling 16 kilometers in length, including 13 metro stations. The estimated cost of the entire project is ₹12,014.91 crore, with the Delhi Government's budgetary share being ₹2,940.46 crore. The project is targeted for completion in 2028.

The Chief Minister thanked honorable Prime Minister Shri Narendra Modi for his support and said the project is a significant step toward implementing his “7-C Vision” for transportation — Common, Connected, Convenient, Congestion-free, Charged, Clean, and Cutting-edge mobility. She emphasized that strengthening public transport is essential for achieving environmental protection and net-zero emission goals. According to her, this metro expansion will play a crucial role in making Delhi cleaner, more efficient, and globally competitive. She also reaffirmed the government’s commitment to working closely with the Centre to build an integrated, citizen-focused transport system aligned with the vision of a “Viksit Bharat” (Developed India).

Chief Minister Rekha Gupta described this decision as an investment in Delhi's future, stating that the construction of these new corridors will not only reduce traffic congestion but also help control pollution. The three approved corridors include RK Ashram to Indraprastha (via Central Vista), Tughlakabad to Kalindi Kunj, and Aerocity to Indira Gandhi Domestic Terminal-1 (IGD T-1). Of the 13 stations to be built, 10 will be underground and 3 will be elevated. This expansion will facilitate seamless interchange with the existing metro network and further improve connectivity between the airport, commercial centers, and residential areas. The government aims to provide citizens with a clean, efficient, and integrated transportation system by reducing dependence on private vehicles.

RK Ashram Marg to Indraprastha Corridor

The most significant corridor under Phase V(A) will run from RK Ashram Marg to Indraprastha, covering 9.913 kilometers with nine proposed stations. Passing through the Central Vista area, this corridor will directly connect Delhi’s key administrative, cultural, and historic zones to the metro network.

It will link major government offices and Kartavya Bhavan complexes, making daily commutes easier for thousands of government employees and visitors. An estimated 60,000 employees and nearly 2 lakh daily commuters are expected to benefit. By reducing reliance on petrol and diesel vehicles, the corridor will also contribute to lower emissions and improved air quality.

Major locations to be connected include RK Ashram Marg (under construction), Shivaji Stadium, Central Secretariat, CCS Buildings, India Gate, War Memorial–High Court, Baroda House, Bharat Mandapam, and Indraprastha. This corridor alone will cost ₹9,570.40 crore, with ₹2,337.24 crore to be contributed by the Delhi government.

Aerocity to Indira Gandhi Airport T-1 Corridor

The second corridor will run from Aerocity to Indira Gandhi Domestic Airport Terminal-1 (IGD T-1). Stretching 2.26 kilometers, it will include one station. This short but strategic link will offer faster, direct metro access to the airport, reducing dependence on taxis and private cars. It is expected to significantly ease traffic congestion around the airport zone. The project cost is estimated at ₹1,419.64 crore, of which ₹351.86 crore will be funded by the Delhi government.

Tughlakabad to Kalindi Kunj Corridor

The third corridor, from Tughlakabad to Kalindi Kunj, will span 3.9 kilometers and include three stations. This route will strengthen metro connectivity in South and South-East Delhi, making daily travel more convenient for residents of these areas. The corridor is estimated to cost ₹1,024.87 crore, with the Delhi government contributing ₹251.36 crore.

Metro Expansion Key to Delhi’s Overall Development: CM

Chief Minister Rekha Gupta said that expanding the Delhi Metro is fundamental to the city’s holistic development. The existing network, along with the new Phase V(A) corridors, will make Delhi and the NCR’s transport ecosystem more efficient, safer, and environmentally sustainable. She added that the expansion will ensure smoother, more punctual travel, reduce pressure on roads, and significantly cut vehicular pollution. With a clear focus on transforming Delhi into a world-class city, the government continues to strengthen public transport — and this latest metro expansion marks another decisive step in that direction.

Similar News

News at a glance